Checkout

Cart () Loading...

    • Quantity:
    • Delivery:
    • Dates:
    • Location:

    $

Resource Library

Show Filters
Result Filters:

115 Results Found

Results per page: 10 40 80

Using Tunneling to Transition to IPv6

Article | Jan. 15, 2013

One of the many useful features of tunneling is to carry non-IP traffic across an IP network, and this is still the case when dealing with IPv6 traffic. This transition mechanism makes use of a configured tunnel to transport IPv6 over a native IPv4 network, which may consist of two sites or more. Unlike the previous transition mechanisms, tunneling is not monolithic; while the basic principles may be similar, the operations are different. The following chart gives a breakdown of the current, major tunneling types in use, particularly in a Cisco environment:

Risk Management with RSA’s Archer GRC Framework

Article | Dec. 05, 2012

Risk is something we deal with on a daily basis. Living in New Jersey and having the occasional storm, I’ve recently performed my own risk assessment determining the value of certain assets and activities and made a decision on what I was willing to spend to reduce risk to what I perceived as an acceptable level. My management of risk was a rather simple case. Sure, in my revised business continuity plan for my home, I’ll make sure that I have more D cell batteries, have my garage door adjusted so it opens manually again, more food I can heat on a stove and that doesn’t rely on refrigeration, and finally I’ll consider a whole house gas generator that uses natural gas, which has always been available to power critical systems like the sump pump in my basement. What if, however, I was a really large business? One with lots of components and interdependencies that require a tight integration in order to succeed? How and where can a large volume of information necessary to management, business continuity, and disaster recovery be correlated and communicated to those individuals who, because of their roles and responsibilities, need to make the critical decisions regarding the management of risk?

Rapid Spanning Tree

Article | Nov. 29, 2012

The STP (Spanning Tree Protocol) standard (IEEE 802.1d) was designed when the recovery after an outage could wait a minute or so and be acceptable performance. With Layer 3 switching in LANs, switching began to compete with routers running protocols because they are able to offer faster alternate paths. Rapid Spanning Tree Protocol (RSTP or IEEE 802.1w) brought the ability to take the twenty seconds of waiting for the Max Age counter plus fifteen seconds of Listening plus fifteen seconds of Learning or fifty seconds down to less than one second for point-to-point connected and edge switches and six seconds for root switches.

Service Portfolio Real World Example – Cloud Services Provider

Article | Nov. 28, 2012

In a recent post, I gave an overall description of a service portfolio and the key components of a portfolio. Here, I will describe how a cloud services provider might implement an ITIL service portfolio. A cloud services provider will regularly have a set of services under development, a set of service in live operation, and a set of services that are retired.

What is a Service Portfolio?

Article | Nov. 14, 2012

ITIL describes a service portfolio as a collection of the overall set of services managed by a service provider. A service portfolio describes a service provider’s boundaries and promises across all of the customers and market spaces it serves. I like to think of a service portfolio as describing the past, present, and future collection of services offered by a service provider. The figure below shows a high-level view of a service portfolio.

Switches and Multiple VLANS

Article | Nov. 08, 2012

This short example illustrates basic VLAN operation. Examining VLANs in a large-scale installation can show the full benefits of VLANs. Consider that this is a small portion of a large corporate headquarters with 5,000 devices connected in a 20 building campus.

Configuring VLANs on a Switch

Article | Nov. 01, 2012

Depending on the switch vendor, the exact steps will vary on how to set up and configure VLANs on a switch. For the network design shown, the general process for setting up VLANs on the switch is:

Meet Customers' Needs Through Agile Team Development

Article | Oct. 26, 2012

We already covered the first three of the twelve advantages of Agile software development. These three advantages focus on team development and refining the process. Advantage #4: Motivated Development Team The positive relationship with a reasonable and satisfied customer is only one of the reasons why many developers prefer to work on Agile projects. The other main contributor is that they tend to value working in self directed teams (which the Agile methods require for success).

What Happens if I Have More Than One Switch With Redundant Links? Part 2

Article | Oct. 18, 2012

Now that the network is installed, each switch has a bridge ID number, and the root switch has been elected, the next step is for each switch to perform a calculation to determine the best link to the root switch. Each switch will do this by comparing the path cost for each link based on the speed. For paths that go through one or more other switches, the link costs are added. The switch compares this aggregate value to the other link costs to determine the best path to the root switch.

Meeting Customer's Needs Through Agile Development

Article | Oct. 12, 2012

There is a reason why the Agile methods are becoming mainstream. They can work! Although every Agile practice is not necessarily appropriate for every organization, each practice has delivered real value to many organizations, and some Agile practices can be used by anyone! This four part series explores twelve ways in which the Agile methods are valuable. I’ll bet that you will find more than a few that could be valuable for you!

What Happens If I Have More Than One Switch With Redundant Links?

Article | Oct. 11, 2012

That depends on their configurations. For example: While it makes very good sense to include redundant physical links in a network, connecting switches in loops, without taking the appropriate measures, will cause havoc on a network. Without the correct measures, a switch floods broadcast frames out all of its ports, causing serious problems for the network devices. The main problem is a broadcast storm where broadcast frames are flooded through every switch until all available bandwidth is used and all network devices have more inbound frames than they can process.

Which ITIL Processes Relate to a Data Center Operations Group?

Article | Sep. 19, 2012

I recently responded to a message on LinkedIn from a regular reader of this blog. He asked several questions which I will answer over the course of several posts. As part of his first question, he described a strategy report that his group is producing. The audience for this strategy report considers ITIL important to the future of their business, and so he must describe which ITIL processes his data center operations group works most closely with.

How to Apply Knowledge Management to Project Management

Article | Aug. 24, 2012

Knowledge Management examines how we acquire, organize, manage, share, and utilize knowledge and information. The Internet gives us an overwhelming amount of information on a daily basis — and the volume of information available is growing rapidly! One of the biggest challenges for individuals and organizations involved in project management is to make the best use of this knowledge and information so they can operate more efficiently, improve decision making, and sustain a competitive advantage.

What is the Difference Between Bridges, Hubs, and Switches?

Article | Aug. 14, 2012

The most obvious difference is that hubs operate at Layer 1 of the OSI model while bridges and switches work with MAC addresses at Layer 2 of the OSI model. Hubs are really just multi-port repeaters. They ignore the content of an Ethernet frame and simply resend every frame they receive out every interface on the hub. The challenge is that the Ethernet frames will show up at every device attached to a hub instead of just the intended destination (a security gap), and inbound frames often collide with outbound frames (a performance issue).

Importance of Lessons Learned in Project Management

Article | July 27, 2012

Lessons learned is a theory, or conclusion, based on evidence at a given time and describes what went wrong (as well as what went right) throughout the lifecycle of a project. Although it’s completed during the project closeout process, it should occur during the entire project lifecycle to ensure all information is captured and documented. Consequences of not having a project review of lessons learned are the increased likelihood of repeating actions that might have caused:

What is Twisted Pair and Does It Work?

Article | June 12, 2012

“Twisted Pair” is another way to identify a network cabling solution that’s also called Unshielded Twisted Pair (UTP) and was invented by Alexander Graham Bell in 1881. Indoor business telephone applications use them in 25-pair bundles. In homes, they were down to four wires, but in networking we use them in 8-wire cables. By twisting the pairs at different rates (twists per foot), cable manufacturers can reduce the electromagnetic pulses coming from the cable while improving the cable’s ability to reject common electronic noise from the environment.

The Difference Between a Project and a Service

Article | April 11, 2012

During a recent ITIL foundation class, a student asked an interesting question. She wanted to know: “What is the difference between a project and a service?” To be honest, I haven’t spent much time thinking about this distinction. However, I think that those of us who practice ITIL consulting and training should have good answers to questions such as this. Here’s how I answered this question.

An Introduction to PMI’s Project Management Life Cycle

Article | April 06, 2012

The term "life cycle" implies two things: that a process is perpetual and that the sequence of events is obligatory or uni-directional. There is no beginning or end to a life cycle and the sequence of events cannot change. A seed cannot go directly to being a mature plant nor revert back to the blossom stage.

Incidents and Problems - Workarounds

Article | March 14, 2012

In my last post I discussed aspects of problem management in the context of a real-life situation regarding the first vehicle I owned. In that scenario, and throughout this series of posts, I’ve demonstrated a real-life situation from a standpoint of the incident and problem management processes that ITIL describes.

What Kind of Network Am I On?

Article | March 01, 2012

Good question! There are lots of networks, so I’m sorry to say that it depends. Let me explain. The smallest computer-based networks are usually PANs or Personal Area Networks. They can connect a wireless keyboard, mouse, or other devices to a computer. You may find them wirelessly linking a printer to your computer. You may have noticed these all include wireless connections. A PAN most often uses wireless technologies like infrared and Bluetooth, so it is really a WPAN (Wireless Personal Area Network).

DHCP for Wireless LAN Clients

Article | Jan. 31, 2012

For us wireless folks that aren’t stellar routing and switching guys, one of the most daunting network tasks is integrating our WLAN infrastructure with the existing wired infrastructure and its services. Understanding wired design topics is pretty fundamental to installing or managing any network, so it really should be on our priority list to spruce up those skills. To give you a nudge on your journey, let’s talk about DHCP for wireless clients.

The 5 Phases of Hacking: Covering Your Tracks

Article | Aug. 30, 2011

An attacker needs to destroy evidence of his presence and activities for several reasons like being able to maintain access and evade detection (and the resulting punishment). Erasing evidence of a compromise is a requirement for any attacker who wants to remain obscure and evade trace back. This usually starts with erasing the contaminated logins and any possible error messages that may have been generated from the attack process.

Are Production Server Reboots Standard Changes?

Article | April 27, 2011

I attended a meeting this week with a customer of mine and a potential new vendor. The new vendor was there to pitch his configuration and setup service offerings for a specific ITSM toolset. My customer has already had one bad experience with an ITSM tool configuration vendor who promised one thing and delivered much less. He ended up with a tool that’s minimally used and not configured to match his business needs. He’s looking for a vendor that can understand his business needs and priorities and quickly help him get his tool configured and working in a short time frame. Then the topic of standard changes came up. My customer asked for examples of standard changes. The vendor responded, “Server reboots are an example of standard changes.”

13 Skills Every IT Pro Should Know

Article | Nov. 12, 2010

No matter which IT field you're working in, there are several skills that are useful for every IT professional to know. Here, seven experienced IT professionals working in the networking, programming, project management, and security fields, share what they believe a...

ASA ACL Logging

Article | Oct. 10, 2010

As any network administrator will tell you, the ASA Security appliance (as well as its forerunner, the PIX) are capable of generating massive amounts of log messages, especially when the firewall/security appliance is set to log messages at debug level to the syslog...

Examining IPSec Perfect Forward Secrecy

Article | Sep. 17, 2010

A feature common to IPSec Virtual Private Network implementations throughout the Cisco product line is Perfect Forward Secrecy (PFS). This optional additional component is now a default supplied configuration setting with the Adaptive Security Device Manager (ASDM) I...

Using ASDM with Minimum User Privileges

Article | July 30, 2010

Occasionally as I'm teaching a Cisco training class, I get an idea for a blog post and it happened again this week. The Securing Networks with ASA Fundamentals curriculum is mostly based on the Adaptive Security Device Manager (ASDM). While the class describes the us...

Allow or Disallow All IPSec Traffic through the Firewall?

Article | June 02, 2010

The subject of this week’s post was actually prompted by a question from a former colleague.  Soon after the PIX Firewall added support for IPSec Virtual Private Networks, a command was added to the command-line, sysopt connection permit-ipsec. This command was subse...

AnyConnect Syslog Troubleshooting

Article | Feb. 15, 2010

I recently was presented with the challenge of logging ALL of the pertinent connection, disconnection, and termination messages associated with the Cisco SSL AnyConnect client without overwhelming the syslog capture display with extraneous messages. This blog will br...

An Introduction to Procurement Management

Article | Jan. 14, 2010

Project procurement activities are often managed by specialists. By this I mean that the procurement department takes over responsibility for purchasing and contract management from the project manager. As a result of this separation of responsibilities, the steps and stages of procurement are often poorly understood by PMs. In this and the next few blog submissions, I will attempt to shed light on procurement activities and relate these activities to the PMI PMBOK.

VPN Connection Process

Article | Jan. 05, 2010

There are some common misconceptions on the part of some of my students as to how VPN sessions are established from either a remote location or remote user to the ASA firewall. In particular, a “gray area” seems to be when the attributes from the tunnel group are app...

“nat-control” versus “no nat-control”

Article | Nov. 24, 2009

ASA and PIX software version 7.0 introduced the configuration command nat-control which didn’t exist in previous versions of code. Although training course material for both the SNAF (Securing Networks with ASA Fundamentals) and SNAA (Securing Networks with ASA Advan...

What’s an RFC and what can they do for me?

Article | Sep. 16, 2009

No matter what book or manual you use to study for the CCNA examination, you will see various protocols and processes referencing an RFC. And, although frequently referenced, the RFCs are seldom actually included in the documentation. So, the logical question becomes...

Static Routing

Article | July 14, 2009

You may have noticed that it’s the dynamic routing protocols that get all the glory. Since I like rooting (routing?) for the underdog, let’s talk about static routes! As you may recall, a router has three methods for learning a route. A route can appear in the routi...

Triple Constraints Model

Article | June 01, 2009

The triple constraints model has been one of the main staples for teaching project management for as long as I can remember. The model is generally represented by a triangle with Scope on the horizontal leg, Time on the left leg, Cost or Resources on the right leg an...