Checkout

Cart () Loading...

    • Quantity:
    • Delivery:
    • Dates:
    • Location:

    $

Resource Library

Show Filters
Result Filters:

23 Results Found

Results per page: 10 40 80

How to Ask Your Company to Pay for VMware Training

Article | Oct. 16, 2017

A lot of IT pros would like to get their work to fund their training and certifications, but if the issue isn't approached with care and forethought, it can be dangerous territory. So how do you justify the costs of training? Luckily, a help desk tech in the healthcare field named R. Lee Young offered up some great suggestions.

Six Scary IT Certification Exams

Article | July 13, 2017

Certifications are the most common way in IT to prove you have the skills to solve various technical and business challenges. In this article, I'll address a range of skill sets. For each certification listed, I've included what the certification measures, the requirements to obtain it.

Top 10 Business Analysis Terms

Article | June 15, 2017

Whether you are just getting started in business analysis or want to gain a better understanding of certain aspects of business analysis, we have compiled a list of frequently used terms to help you get started.

Two Great Security Features of VMware’s NSX Network Virtualization Platform

Article | Aug. 30, 2016

The VMware NSX platform combines networking and security functionality directly in the hypervisor and it interoperable with a vast majority of VMware’s products. The platform provides a set of logical networking elements and services, using logical switching, routing, load balancing, VPN, firewall, etc. This product decouples network functionality from the physical devices.

Top 7 Key Features of VMware Horizon 7

Article | June 27, 2016

VMware announced Horizon 7 in February and subsequently released the software updates. Horizon 7 provides a more streamlined, high-performance virtual desktop and application experience. New updates include features such as Instant Clones, Smart Policies, Blast Extreme and greater scalability with Cloud Pod Architecture. Let’s dig into the seven key features that Horizon 7 brings!

Is Becoming a CAPM or PMP Worth It?

Article | Aug. 05, 2015

My most recent blog addressed whether PMP and CAPM boot camps are worth the time and effort. I concluded that for most exam writers, it really did make sense to buckle down and take advantage of all that a quality boot camp offers.

How to Monitor VMware vSphere Distributed Switches

Article | April 21, 2015

It’s not uncommon for different teams to be managing the virtual switch and physical switch configurations. This can make it very difficult to troubleshoot unless each configuration parameter has been gone through manually. There have been enhancements to the vSphere Distributed Switch over the past few years to address these operational challenges.

What’s the Difference Between High Availability and Fault Tolerance in VMware vSphere?

Article | Dec. 30, 2014

What’s the difference between high availability and fault tolerance in VMware vSphere? This article elaborates on first configuring high availability and then layer on the fault tolerance capability. Learn more.

Problem Management and Knowledge Management

Article | April 28, 2014

Most organizations quickly realize that knowledge management must be integrated with incident management in order to improve the quality of service and the efficiency of providing assisted service. What is not as quickly recognized is the value of integrating knowledge management with problem management.

Military Orders Process vs. Project Management Methodology, Part 1

Article | Aug. 13, 2013

For a project manager (PM) who has served as a military officer on a battalion or higher staff, the parallels between the military decision-making process (MDMP), the orders production process, and project management doctrine prescribed by the Project Management Institute (PMI) are difficult to ignore. Both the MDMP and the processes outlined in A Guide to the Project Management Body of Knowledge—Fifth Edition (PMBOK® Guide) are iterative in nature, allow for the introduction of changes to the original plan, assign tasks and responsibilities, and involve the concept of managing the scope of the operation or project.