Checkout

Cart () Loading...

    • Quantity:
    • Delivery:
    • Dates:
    • Location:

    $

Resource Library

Filter By

Topics

Show Filters
Result Filters:

144 Results Found

Results per page: 10 40 80

What Happens if I Have More Than One Switch With Redundant Links? Part 2

Article | Oct. 18, 2012

Now that the network is installed, each switch has a bridge ID number, and the root switch has been elected, the next step is for each switch to perform a calculation to determine the best link to the root switch. Each switch will do this by comparing the path cost for each link based on the speed. For paths that go through one or more other switches, the link costs are added. The switch compares this aggregate value to the other link costs to determine the best path to the root switch.

Meeting Customer's Needs Through Agile Development

Article | Oct. 12, 2012

There is a reason why the Agile methods are becoming mainstream. They can work! Although every Agile practice is not necessarily appropriate for every organization, each practice has delivered real value to many organizations, and some Agile practices can be used by anyone! This four part series explores twelve ways in which the Agile methods are valuable. I’ll bet that you will find more than a few that could be valuable for you!

What Happens If I Have More Than One Switch With Redundant Links?

Article | Oct. 11, 2012

That depends on their configurations. For example: While it makes very good sense to include redundant physical links in a network, connecting switches in loops, without taking the appropriate measures, will cause havoc on a network. Without the correct measures, a switch floods broadcast frames out all of its ports, causing serious problems for the network devices. The main problem is a broadcast storm where broadcast frames are flooded through every switch until all available bandwidth is used and all network devices have more inbound frames than they can process.

Which ITIL Processes Relate to a Data Center Operations Group?

Article | Sep. 19, 2012

I recently responded to a message on LinkedIn from a regular reader of this blog. He asked several questions which I will answer over the course of several posts. As part of his first question, he described a strategy report that his group is producing. The audience for this strategy report considers ITIL important to the future of their business, and so he must describe which ITIL processes his data center operations group works most closely with.

How to Apply Knowledge Management to Project Management

Article | Aug. 24, 2012

Knowledge Management examines how we acquire, organize, manage, share, and utilize knowledge and information. The Internet gives us an overwhelming amount of information on a daily basis — and the volume of information available is growing rapidly! One of the biggest challenges for individuals and organizations involved in project management is to make the best use of this knowledge and information so they can operate more efficiently, improve decision making, and sustain a competitive advantage.

What is the Difference Between Bridges, Hubs, and Switches?

Article | Aug. 14, 2012

The most obvious difference is that hubs operate at Layer 1 of the OSI model while bridges and switches work with MAC addresses at Layer 2 of the OSI model. Hubs are really just multi-port repeaters. They ignore the content of an Ethernet frame and simply resend every frame they receive out every interface on the hub. The challenge is that the Ethernet frames will show up at every device attached to a hub instead of just the intended destination (a security gap), and inbound frames often collide with outbound frames (a performance issue).

Importance of Lessons Learned in Project Management

Article | July 27, 2012

Lessons learned is a theory, or conclusion, based on evidence at a given time and describes what went wrong (as well as what went right) throughout the lifecycle of a project. Although it’s completed during the project closeout process, it should occur during the entire project lifecycle to ensure all information is captured and documented. Consequences of not having a project review of lessons learned are the increased likelihood of repeating actions that might have caused:

What is Twisted Pair and Does It Work?

Article | June 12, 2012

“Twisted Pair” is another way to identify a network cabling solution that’s also called Unshielded Twisted Pair (UTP) and was invented by Alexander Graham Bell in 1881. Indoor business telephone applications use them in 25-pair bundles. In homes, they were down to four wires, but in networking we use them in 8-wire cables. By twisting the pairs at different rates (twists per foot), cable manufacturers can reduce the electromagnetic pulses coming from the cable while improving the cable’s ability to reject common electronic noise from the environment.

When Learning Fails: Six Classic Mistakes and How to Avoid Them

Webinar – Recorded | May 12, 2012

Everyone has been involved in a learning program or project that has not delivered its intended impact. Across organizations, remarkably similar but preventable missteps are made in needs identification, learning strategies, program development and implementation.  Instructor Tom Gram, Senior Director of Professional Services at Global Knowledge, will present six classic mistakes learning professionals make that reduce chances for success along with evidence-based practices to help prevent them. 

The Difference Between a Project and a Service

Article | April 11, 2012

During a recent ITIL foundation class, a student asked an interesting question. She wanted to know: “What is the difference between a project and a service?” To be honest, I haven’t spent much time thinking about this distinction. However, I think that those of us who practice ITIL consulting and training should have good answers to questions such as this. Here’s how I answered this question.