Checkout

Cart () Loading...

    • Quantity:
    • Delivery:
    • Dates:
    • Location:

    $

Resource Library

Filter By

Topics

Show Filters
Result Filters:

129 Results Found

Results per page: 10 40 80

What Happens If I Have More Than One Switch With Redundant Links?

Article | Oct. 11, 2012

That depends on their configurations. For example: While it makes very good sense to include redundant physical links in a network, connecting switches in loops, without taking the appropriate measures, will cause havoc on a network. Without the correct measures, a switch floods broadcast frames out all of its ports, causing serious problems for the network devices. The main problem is a broadcast storm where broadcast frames are flooded through every switch until all available bandwidth is used and all network devices have more inbound frames than they can process.

Data Center Basics: the Differences Between IOS and NX-OS

Article | Sep. 04, 2012

As we discussed previously, Cisco created the Nexus Operating System (NX-OS) to power its next-generation data-center switching platform. While this new OS shares many similarities to the original IOS, there are some definite differences that you need to be aware of as you begin using it.

How to Apply Knowledge Management to Project Management

Article | Aug. 24, 2012

Knowledge Management examines how we acquire, organize, manage, share, and utilize knowledge and information. The Internet gives us an overwhelming amount of information on a daily basis — and the volume of information available is growing rapidly! One of the biggest challenges for individuals and organizations involved in project management is to make the best use of this knowledge and information so they can operate more efficiently, improve decision making, and sustain a competitive advantage.

Importance of Lessons Learned in Project Management

Article | July 27, 2012

Lessons learned is a theory, or conclusion, based on evidence at a given time and describes what went wrong (as well as what went right) throughout the lifecycle of a project. Although it’s completed during the project closeout process, it should occur during the entire project lifecycle to ensure all information is captured and documented. Consequences of not having a project review of lessons learned are the increased likelihood of repeating actions that might have caused:

What is Twisted Pair and Does It Work?

Article | June 12, 2012

“Twisted Pair” is another way to identify a network cabling solution that’s also called Unshielded Twisted Pair (UTP) and was invented by Alexander Graham Bell in 1881. Indoor business telephone applications use them in 25-pair bundles. In homes, they were down to four wires, but in networking we use them in 8-wire cables. By twisting the pairs at different rates (twists per foot), cable manufacturers can reduce the electromagnetic pulses coming from the cable while improving the cable’s ability to reject common electronic noise from the environment.

When Learning Fails: Six Classic Mistakes and How to Avoid Them

Webinar – Recorded | May 12, 2012

Everyone has been involved in a learning program or project that has not delivered its intended impact. Across organizations, remarkably similar but preventable missteps are made in needs identification, learning strategies, program development and implementation.  Instructor Tom Gram, Senior Director of Professional Services at Global Knowledge, will present six classic mistakes learning professionals make that reduce chances for success along with evidence-based practices to help prevent them. 

The Difference Between a Project and a Service

Article | April 11, 2012

During a recent ITIL foundation class, a student asked an interesting question. She wanted to know: “What is the difference between a project and a service?” To be honest, I haven’t spent much time thinking about this distinction. However, I think that those of us who practice ITIL consulting and training should have good answers to questions such as this. Here’s how I answered this question.

An Introduction to PMI’s Project Management Life Cycle

Article | April 06, 2012

The term "life cycle" implies two things: that a process is perpetual and that the sequence of events is obligatory or uni-directional. There is no beginning or end to a life cycle and the sequence of events cannot change. A seed cannot go directly to being a mature plant nor revert back to the blossom stage.

Five Secrets for Successfully Virtualizing a Data Center

White Paper | April 04, 2012

Here are some secrets, tips, and tricks for virtualizing your datacenter. We want to introduce some best practices for virtualization, while not being too biased towards one virtualization vendor or another. We'll use some common examples of products and tools that work with VMware's vSphere and Microsoft's Hyper-V, but with an eye toward virtualization in general, and not the specifics of any of the capable platforms that could be used). We will assume, however, that bare metal hypervisors, in other words virtualization platforms where the hyper visor is the OS, will be used as opposed to running a hypervisor on top of an existing general-purpose operating system (which is great in a lab, but terrible for data center projects).

Incidents and Problems - Workarounds

Article | March 14, 2012

In my last post I discussed aspects of problem management in the context of a real-life situation regarding the first vehicle I owned. In that scenario, and throughout this series of posts, I’ve demonstrated a real-life situation from a standpoint of the incident and problem management processes that ITIL describes.