Which ITIL Processes Relate to a Data Center Operations Group?

Article | Sep. 19, 2012

I recently responded to a message on LinkedIn from a regular reader of this blog. He asked several questions which I will answer over the course of several posts. As part of his first question, he described a strategy report that his group is producing. The audience for this strategy report considers ITIL important to the future of their business, and so he must describe which ITIL processes his data center operations group works most closely with.

How to Apply Knowledge Management to Project Management

Article | Aug. 24, 2012

Knowledge Management examines how we acquire, organize, manage, share, and utilize knowledge and information. The Internet gives us an overwhelming amount of information on a daily basis — and the volume of information available is growing rapidly! One of the biggest challenges for individuals and organizations involved in project management is to make the best use of this knowledge and information so they can operate more efficiently, improve decision making, and sustain a competitive advantage.

What is the Difference Between Bridges, Hubs, and Switches?

Article | Aug. 14, 2012

The most obvious difference is that hubs operate at Layer 1 of the OSI model while bridges and switches work with MAC addresses at Layer 2 of the OSI model. Hubs are really just multi-port repeaters. They ignore the content of an Ethernet frame and simply resend every frame they receive out every interface on the hub. The challenge is that the Ethernet frames will show up at every device attached to a hub instead of just the intended destination (a security gap), and inbound frames often collide with outbound frames (a performance issue).

Importance of Lessons Learned in Project Management

Article | July 27, 2012

Lessons learned is a theory, or conclusion, based on evidence at a given time and describes what went wrong (as well as what went right) throughout the lifecycle of a project. Although it’s completed during the project closeout process, it should occur during the entire project lifecycle to ensure all information is captured and documented. Consequences of not having a project review of lessons learned are the increased likelihood of repeating actions that might have caused:

What is Twisted Pair and Does It Work?

Article | June 12, 2012

“Twisted Pair” is another way to identify a network cabling solution that’s also called Unshielded Twisted Pair (UTP) and was invented by Alexander Graham Bell in 1881. Indoor business telephone applications use them in 25-pair bundles. In homes, they were down to four wires, but in networking we use them in 8-wire cables. By twisting the pairs at different rates (twists per foot), cable manufacturers can reduce the electromagnetic pulses coming from the cable while improving the cable’s ability to reject common electronic noise from the environment.

When Learning Fails: Six Classic Mistakes and How to Avoid Them

Webinar – Recorded | May 12, 2012

Everyone has been involved in a learning program or project that has not delivered its intended impact. Across organizations, remarkably similar but preventable missteps are made in needs identification, learning strategies, program development and implementation.  Instructor Tom Gram, Senior Director of Professional Services at Global Knowledge, will present six classic mistakes learning professionals make that reduce chances for success along with evidence-based practices to help prevent them. 

12 Steps to Bring Your Own Device (BYOD) Success

White Paper | April 16, 2012

IT departments have multiple opportunities and challenges as a result of the Bring Your Own Device (BYOD) invasion. The most common opportunity is to reinforce enterprise network security from both the inside and the outside. Supporting BYOD also offers more monitoring and tracking of activities that provide a more detailed view of network traffic flow. Alternatively, it will be a challenge for some IT departments to give up control over which devices may access their enterprise network. Another challenge will be to have the users doing configurations for network access, which adds human error to a crucial part of the process. The opportunities and challenges BYOD represents are real. Enterprises must make their network infrastructure BYOD ready to meet the onslaught.

The Difference Between a Project and a Service

Article | April 11, 2012

During a recent ITIL foundation class, a student asked an interesting question. She wanted to know: “What is the difference between a project and a service?” To be honest, I haven’t spent much time thinking about this distinction. However, I think that those of us who practice ITIL consulting and training should have good answers to questions such as this. Here’s how I answered this question.

An Introduction to PMI’s Project Management Life Cycle

Article | April 06, 2012

The term "life cycle" implies two things: that a process is perpetual and that the sequence of events is obligatory or uni-directional. There is no beginning or end to a life cycle and the sequence of events cannot change. A seed cannot go directly to being a mature plant nor revert back to the blossom stage.

Incidents and Problems - Workarounds

Article | March 14, 2012

In my last post I discussed aspects of problem management in the context of a real-life situation regarding the first vehicle I owned. In that scenario, and throughout this series of posts, I’ve demonstrated a real-life situation from a standpoint of the incident and problem management processes that ITIL describes.