59 Results Found
A structured business analysis interview is much more than a conversation; it is a controlled event requiring attention to detail, cautious design, and a strong social foundation from which to build a trusting and lasting relationship.
Resource management is always an issue in any project, especially when the stakeholders from whom we need time have operational duties to perform. If our requirements team was at our disposal 100 percent, always completed activities on target, and worked a full eight hour day without distraction or a loss of productivity, then estimating time would be simple. In this paper, we explore standard approaches to time estimation, the dangers of multi-tasking, and estimation alternatives, which consider work habits and productivity norms.
Linking business analysis skills with the methods of The Open Group’s Architecture Framework, TOGAF®, facilitates stronger IT results that drive business value.
Shortly after being awarded an ITIL® Foundation certification, a recipient’s natural inclination is to ask: “Now what? How do I take the best practices I’ve learned and apply them to my organization?”
Business processes are complicated, and mapping them is not a trivial task. Modelling standards give us the tools to model complex processes, but they do not tell us the best way to approach a model or effectively use the tool. In this hour-long webinar, Global Knowledge instructor Rod Fage will guide you through the best way to develop a model, from determining the goal and scope of the process and measuring its effectiveness, to modelling the process in a hierarchical top-down approach, enabling business analyst to continuously validate the model.
Cisco Internetwork Operating System (IOS) has been around since a little after the inception of Cisco Systems as a company. In 1984, Len and Sandy Bosack from Stanford University founded Cisco Systems with a small commercial gateway server. The first Cisco router that I touched was an Advanced Gateway Server (AGS), which was the first marketed product of the company. After this came the Mid-Range Gateway Server (MGS), the Compact Gateway Server (CGS) and later the Integrated Gateway Server (IGS) and AGS+. The first version of IOS that I touched was 8.2(7). The operating system was based on a Unix-based system and was designed as a monolithic operating system, meaning that processes are stacked and interrelated.
A strong event management process that is able to detect changes of state throughout an organization’s IT environment is a key aspect of a complete suite of service management processes. Event management ultimately helps an organization maintain control through an understanding of the state of things, and how the state of those things changes in an IT environment.
The past months have seen the release of both the International Institute of Business Analysis (IIBA)'s long-awaited A Guide to the Business Analysis Body of Knowledge (BABOK® Guide) v3 and the Project Management Institute® (PMI®)'s Business Analysis for Practitioners. While both represent interesting developments in the field of business analysis, they also provide lots of information to process. There's no need to go it alone! Join Global Knowledge instructors Cheryl Lee and Adam McClellan for this complimentary, hour- long webinar to learn about the differences between the two guides, how both guides compare to the previous version of the BABOK ® Guide, and where all this might be going.
We build requirements at a quantum level to connect the vital elements, which are needed to realize a requirement. As we consider the relationships between the behaviors, actions, and responses, we begin to identify and associate the characteristics and conditions, which will drive and constrain the behaviors. Realizing a requirement means joining these elements together and noting them as elements of the requirement.
A range of factors can influence the data center you choose. You should consider all of the factors listed in this white paper before deciding where to place your servers.