Your browser is incompatible with this site. Upgrade to a different browser like Google Chrome or Mozilla Firefox to experience this site.
225 Results Found
Project procurement activities are often managed by specialists. By this I mean that the procurement department takes over responsibility for purchasing and contract management from the project manager. As a result of this separation of responsibilities, the steps and stages of procurement are often poorly understood by PMs. In this and the next few blog submissions, I will attempt to shed light on procurement activities and relate these activities to the PMI PMBOK.
There are some common misconceptions on the part of some of my students as to how VPN sessions are established from either a remote location or remote user to the ASA firewall. In particular, a “gray area” seems to be when the attributes from the tunnel group are app...
ASA and PIX software version 7.0 introduced the configuration command nat-control which didn’t exist in previous versions of code. Although training course material for both the SNAF (Securing Networks with ASA Fundamentals) and SNAA (Securing Networks with ASA Advan...
No matter what book or manual you use to study for the CCNA examination, you will see various protocols and processes referencing an RFC. And, although frequently referenced, the RFCs are seldom actually included in the documentation. So, the logical question becomes...
The triple constraints model has been one of the main staples for teaching project management for as long as I can remember. The model is generally represented by a triangle with Scope on the horizontal leg, Time on the left leg, Cost or Resources on the right leg an...