Checkout

Cart () Loading...

    • Quantity:
    • Delivery:
    • Dates:
    • Location:

    $

Resource Library

Filter By
Show Filters
Result Filters:

101 Results Found

Results per page: 10 40 80

PMP Formula of the Week: Point of Total Assumption

Article | Aug. 10, 2015

Your organization and a seller have just agreed to a contract with a total cost of $150,000, an estimated profit of $10,000, buyer/seller sharing of 70/30 and a ceiling price of $170,000. What is the PTA (point of total assumption)? A. $170,000 B. $160,000 C. $164,2...

Tech Skills Heading the Way of the Dinosaur

Article | June 11, 2015

If any of the following reminiscences ring true to you, have you moved beyond them? If not, it might be time to make some new discoveries.

VLANs and Trunks

White Paper | June 11, 2015

When properly utilized, VLANs and trunks provide flexibility, stability and ease of troubleshooting. This paper provides technical details about VLANs and trunks, along with design options at a basic to intermediate level. Recommendations and commands are included throughout.

Switching Operations

White Paper | June 05, 2015

Switches play a vital role in moving data from one device to another. Specifically, switches greatly improve network performance, compared to hubs, by providing dedicated bandwidth to each end device, supporting full-duplex connectivity, utilizing the MAC address table to make forwarding decisions, and utilizing ASICs and CAM tables to increase the rate at which frames can be processed.

Quick Look at the PMBOK® Guide: Decision Tree Diagrams

Article | May 22, 2015

In this blog series, we'll get you up to speed on using the key tools listed in the PMBOK® Guide, including Decision Tree Diagrams.

Project Team Member Performance

White Paper | May 21, 2015

Most project team members report to a functional manager who controls their assignments, performance appraisals, raises, bonuses, etc. Until recently, project managers (PMs) had little input into any of these processes. In this paper, learn how a PM working in a functional or matrix organizational structure can get team members to perform.

Quick Look at the PMBOK® Guide: Work Breakdown Structure (WBS)

Article | April 24, 2015

In this blog series, we'll get you up to speed on using the key tools listed in the PMBOK® Guide. First up, Work Breakdown Structure (WBS).

Are All Those Project Management Tools Really Needed?

White Paper | April 17, 2015

The tools described in this white paper are essential PM tools. Tools that will best be used, regardless of the project, are the WBS, communication model, and the precedence diagram. The other tools will be needed depending on the project.

How to Enhance Your Global Project Management Competencies

White Paper | April 17, 2015

Good global project managers develop their own competencies, and those of their team members. We can use technology to bridge distance, but also focus on the human aspects of culture, work habits, management style, English as a mandated language, communication, and uncertainty. Perform a self-assessment and assess your team members, then look for on-the-job and other improvement opportunities. A good way to learn more about how to overcome these challenges is to become involved in the international community.

Configuring Multicast with MPLS and GETVPN

White Paper | April 09, 2015

This paper covers the configuration of IP Multicast with Multiprotocol Label Switching (MPLS) including the basics of Multicast with the Group Encrypted Transport VPN (GETVPN).