Your browser is incompatible with this site. Upgrade to a different browser like Google Chrome or Mozilla Firefox to experience this site.
1106 Results Found
Where should you apply the CSS, and why are there two places to apply it? One approach is to pick one of the parameters and apply the permissions there. Quite often, an administrator will pick the phone-level CSS and configure it there so that it applies to all calls made from all lines. The goal is to specify what partitions are allowed to be called.
For project managers, meeting stakeholder expectations means that you have to know what the expectations are to begin with if you are ever expected to meet them. After expectations have been set, follow up with your stakeholders to ensure that the expectations haven't changed. People change their minds often, so communicate in order to influence their perceptions and expectations. You may be surprised how simple communication and understanding expectations can positively affect your next project.
PowerVM is the virtualization environment for AIX, Linux, and IBM i running on the IBM POWER hardware platform. This white paper provides an overview of PowerVM concepts, architecture, terminology, and capabilities.
In this series, we are looking at six things that can trip up project managers. We’ve covered the hazards of overcommitting, how to provide feedback, the importance of taking responsibility, staying focused, and what leading from the front can actually look like. Finally, we’ll take a look at handling team input.
For smaller companies, configuring a dial plan to account for variations in dialed numbers is often not a problem. However, companies that are larger and more global in nature encounter a number of issues when designing their dial plan approach.
Michael Scarborough and Ryan Ballmer, co-authors of Global Knowledge ITIL courseware, discuss how to become an ITIL expert.
Most of us have been involved with an e-Learning design project that has not delivered its intended impact. Across organizations, remarkably similar but preventable mistakes are made in the design and development of e-Learning that can frustrate learners, reduce effectiveness and ultimately impede success. Small missteps early in the design process can lead to costly problems in the development and implementation stages. This session will present 5 common mistakes e-Learning professionals make. For each mistake, evidence-based best practices will also be shared to help prevent their occurrence in the future. The evidence-based best practices can serve as a design guide for successful e-Learning projects of all types. Finally, approaches will also be discussed to help organizations integrate evidence-based best practices into their e-Learning design efforts.
Border Gateway Protocol (BGP) is a fascinating protocol because there are a lot of things that can be done with BGP. However, there has always been an issue with BGP, which is convergence (the time the network or protocol takes to accept change). BGP was designed for scale, not speed, so it’s something that we’ve had to tolerate from its inception.
License provisioning has always been a bit of a challenge in the CUCM environment. Prior to CUCM v9.0, licensing was managed on a per-cluster basis with each cluster requiring its own license files that were tied to the media access control (MAC) address of the cluster’s publisher. This approach to license management was limiting in the fact that one cluster might have unused licenses while another cluster may be at its limit and sharing between clusters was not possible.
In this hour-long webinar, Global Knowledge instructor and PMP-certified project management expert Daniel Stober will look beyond the triple constraint model and focus on the true essence of project success: stakeholder satisfaction. Many project managers (PMs) fall into the familiar habit of managing based on the constraints of time, cost and scope. While all of these are important, managing them effectively doesn't guarantee project success if the PM fails to conduct proper stakeholder management. To manage stakeholders effectively, the PM has to set expectations. Once expectations are set, the PM must influence the perception of project performance with the stakeholder. Tune in as Dan explores methods you can use to accomplish that goal.